Solar power plant · Alamosa, CO

Hooper Solar

Hooper Solar is a 52 MW solar power plant in Alamosa County, Colorado, operated by Solar Star Colorado III, LLC. Its oldest generator still running came online in 2015. In 2025 it generated 122 GWh, about what 15,000 average Colorado homes use in a year.

Capacity52 MWNameplate, September 2026
Generated122 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2015

Hooper Solar in context

Among the 185 solar plants in Colorado in the EIA's inventory, it is the 16th largest, about 1.4% of the state's 3.8 GW of solar capacity.

Alamosa County has 10 power plants of 1 MW or more with 203 MW in all; Hooper Solar is 26% of that and the largest of 9 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Alamosa County goes 2.8 hours a year without power, the 23rd most of 39 counties in Colorado. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 122
0501001502019202120232025122

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hooper Solar (outlined) and other plants in Alamosa County, shaded. 37.692, -105.991.

Plant facts

Operator
Solar Star Colorado III, LLC
Sector
IPP Non-CHP
Grid operator
PSCO
County
Alamosa County, CO
EIA plant ID
60008
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SCCO3 Solar Photovoltaic 52 MW 2015 –

Nearby

Other plants in Alamosa County

Alamosa · 53 MWSan Luis Valley Solar Ranch · 35 MWAlamosa Solar · 30 MWGreater Sandhill I · 19 MWSunE Alamosa · 8.2 MWRock Creek 2 CSG · 1.6 MWAlamosa Solar South CSG · 1.6 MWOak Leaf Solar XXX LLC (CSG) · 1.5 MW

Questions

Hooper Solar, answered

How much power does Hooper Solar produce?

Hooper Solar has 52 MW of capacity from one generator. In 2025 it generated 122 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hooper Solar power?

Its 2025 output of 122 GWh equals the yearly electricity use of about 15,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hooper Solar?

Hooper Solar is in Alamosa County, Colorado, at about 37.692°, -105.991°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Alamosa County goes 2.8 hours a year without power, the 23rd most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Hooper Solar?

It is operated by Solar Star Colorado III, LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.

When did Hooper Solar open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.