Wind power plant · Vermilion, IL
Hoopeston Wind LLC
Hoopeston Wind LLC is a 98 MW wind power plant in Vermilion County, Illinois, operated by Hoopeston Wind LLC. Its oldest generator still running came online in 2015. In 2025 it generated 338 GWh, about what 39,000 average Illinois homes use in a year.
Hoopeston Wind LLC in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 43rd largest, about 1.1% of the state's 8.7 GW of wind capacity.
Vermilion County has 11 power plants of 1 MW or more with 521 MW in all; Hoopeston Wind LLC is 19% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Vermilion County goes 5.8 hours a year without power, the 29th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hoopeston Wind LLC (outlined) and other plants in Vermilion County, shaded. 40.400, -87.799.
Plant facts
- Operator
- Hoopeston Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Vermilion County, IL
- EIA plant ID
- 59021
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HOO1 | Onshore Wind Turbine | 98 MW | 2015 | – |
Nearby
Other plants in Vermilion County
Questions
Hoopeston Wind LLC, answered
How much power does Hoopeston Wind LLC produce?
Hoopeston Wind LLC has 98 MW of capacity from one generator. In 2025 it generated 338 GWh, 39% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hoopeston Wind LLC power?
Its 2025 output of 338 GWh equals the yearly electricity use of about 39,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hoopeston Wind LLC?
Hoopeston Wind LLC is in Vermilion County, Illinois, at about 40.400°, -87.799°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Vermilion County goes 5.8 hours a year without power, the 29th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Hoopeston Wind LLC?
It is operated by Hoopeston Wind LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Hoopeston Wind LLC open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.