Solar power plant · Otter Tail, MN

Hoot Lake Solar

Hoot Lake Solar is a 50 MW solar power plant in Otter Tail County, Minnesota, operated by Otter Tail Power Co. Its oldest generator still running came online in 2023. In 2025 it generated 73 GWh, about what 8,200 average Minnesota homes use in a year.

Capacity50 MWNameplate, September 2026
Generated73 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators1Oldest from 2023

Hoot Lake Solar in context

Among the 544 solar plants in Minnesota in the EIA's inventory, it is the 7th largest, about 2.3% of the state's 2.1 GW of solar capacity.

Otter Tail County has 3 power plants of 1 MW or more with 53 MW in all; Hoot Lake Solar is 93% of that.

Its capacity factor of 17% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Otter Tail County goes 4.5 hours a year without power, the 11th most of 54 counties in Minnesota. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406080100202320242025GWh 73
02040608010020232024202573

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hoot Lake Solar (outlined) and other plants in Otter Tail County, shaded. 46.291, -96.043.

Plant facts

Operator
Otter Tail Power Co
Sector
Electric Utility
Grid operator
MISO
County
Otter Tail County, MN
EIA plant ID
65066
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 50 MW 2023 –

Nearby

Other plants in Otter Tail County

Lake Region Community Hybrid, LLC · 2.5 MWHoot Lake · 1.0 MW

Questions

Hoot Lake Solar, answered

How much power does Hoot Lake Solar produce?

Hoot Lake Solar has 50 MW of capacity from one generator. In 2025 it generated 73 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hoot Lake Solar power?

Its 2025 output of 73 GWh equals the yearly electricity use of about 8,200 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hoot Lake Solar?

Hoot Lake Solar is in Otter Tail County, Minnesota, at about 46.291°, -96.043°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Otter Tail County goes 4.5 hours a year without power, the 11th most of 54 counties in Minnesota. The county's page has the full outage record.

Who operates Hoot Lake Solar?

It is operated by Otter Tail Power Co (EIA sector: Electric Utility), and it feeds MISO.

When did Hoot Lake Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.