Hornet Solar (TX) is a 600 MW solar power plant in Swisher County, Texas, operated by Vesper Energy Development LLC. Its oldest generator still running came online in 2025. In 2025 it generated 1.2 TWh, about what 91,000 average Texas homes use in a year.

Capacity600 MWNameplate, September 2026
Generated1.2 TWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Hornet Solar (TX) in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 3rd largest, about 1.6% of the state's 37 GW of solar capacity.

Swisher County has 2 power plants of 1 MW or more with 1.1 GW in all; Hornet Solar (TX) is 55% of that and the largest of 2 solar plants there.

The average electricity customer in Swisher County goes 3.7 hours a year without power, the 214th most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hornet Solar (TX) (outlined) and other plants in Swisher County, shaded. 34.485, -101.971.

Plant facts

Operator
Vesper Energy Development LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Swisher County, TX
EIA plant ID
65463
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HRNET Solar Photovoltaic 600 MW 2025 –

Nearby

Other plants in Swisher County

Questions

Hornet Solar (TX), answered

How much power does Hornet Solar (TX) produce?

Hornet Solar (TX) has 600 MW of capacity from one generator. In 2025 it generated 1.2 TWh.

How many homes does Hornet Solar (TX) power?

Its 2025 output of 1.2 TWh equals the yearly electricity use of about 91,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hornet Solar (TX)?

Hornet Solar (TX) is in Swisher County, Texas, at about 34.485°, -101.971°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Swisher County goes 3.7 hours a year without power, the 214th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Hornet Solar (TX)?

It is operated by Vesper Energy Development LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Hornet Solar (TX) open?

Its oldest generator still running came online in 2025.