Wind power plant · Taylor, TX
Horse Hollow Wind Energy Center
Horse Hollow Wind Energy Center is a 736 MW wind power plant in Taylor County, Texas, operated by FPL Energy Horse Hollow LLC. Its oldest generator still running came online in 2005. In 2025 it generated 2.4 TWh, about what 182,000 average Texas homes use in a year.
Horse Hollow Wind Energy Center in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 2nd largest, about 1.6% of the state's 45 GW of wind capacity.
Taylor County has 6 power plants of 1 MW or more with 991 MW in all; Horse Hollow Wind Energy Center is 74% of that and the largest of 3 wind plants there.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Taylor County goes 8.4 hours a year without power, the 136th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Horse Hollow Wind Energy Center (outlined) and other plants in Taylor County, shaded. 32.214, -100.057.
Plant facts
- Operator
- FPL Energy Horse Hollow LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Taylor County, TX
- EIA plant ID
- 56291
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3 | Onshore Wind Turbine | 299 MW | 2006 | – |
| 2 | Onshore Wind Turbine | 224 MW | 2006 | – |
| 1 | Onshore Wind Turbine | 213 MW | 2005 | – |
Nearby
Other plants in Taylor County
Questions
Horse Hollow Wind Energy Center, answered
How much power does Horse Hollow Wind Energy Center produce?
Horse Hollow Wind Energy Center has 736 MW of capacity from 3 generators. In 2025 it generated 2.4 TWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Horse Hollow Wind Energy Center power?
Its 2025 output of 2.4 TWh equals the yearly electricity use of about 182,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Horse Hollow Wind Energy Center?
Horse Hollow Wind Energy Center is in Taylor County, Texas, at about 32.214°, -100.057°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Taylor County goes 8.4 hours a year without power, the 136th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Horse Hollow Wind Energy Center?
It is operated by FPL Energy Horse Hollow LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Horse Hollow Wind Energy Center open?
Its oldest generator still running came online in 2005.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.