Hydro power plant · Flathead, MT

Hungry Horse

Hungry Horse is a 428 MW hydro power plant in Flathead County, Montana, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1952. In 2025 it generated 633 GWh, about what 62,000 average Montana homes use in a year.

Capacity428 MWNameplate, September 2026
Generated633 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators4Oldest from 1952

Hungry Horse in context

Among the 23 hydro plants in Montana in the EIA's inventory, it is the 3rd largest, about 16% of the state's 2.7 GW of hydro capacity.

Flathead County has 4 power plants of 1 MW or more with 438 MW in all; Hungry Horse is 98% of that and the largest of 2 hydro plants there.

Its capacity factor of 17% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Flathead County goes 6.9 hours a year without power, the 17th most of 35 counties in Montana. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,20020182019202020212022202320242025GWh 633
02004006008001,0001,2002019202120232025633

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hungry Horse (outlined) and other plants in Flathead County, shaded. 48.342, -114.014.

Plant facts

Operator
U S Bureau of Reclamation
Sector
Electric Utility
Grid operator
BPAT
County
Flathead County, MT
EIA plant ID
2203
Where Montana's power comes from → Montana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 107 MW 1952 –
2 Conventional Hydroelectric 107 MW 1952 –
3 Conventional Hydroelectric 107 MW 1953 –
4 Conventional Hydroelectric 107 MW 1953 –

Nearby

Other plants in Flathead County

Big Fork · 4.1 MWFlathead Landfill to Gas Energy Facility · 3.2 MWStoltze CoGen1 · 2.8 MW

Questions

Hungry Horse, answered

How much power does Hungry Horse produce?

Hungry Horse has 428 MW of capacity from 4 generators. In 2025 it generated 633 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hungry Horse power?

Its 2025 output of 633 GWh equals the yearly electricity use of about 62,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hungry Horse?

Hungry Horse is in Flathead County, Montana, at about 48.342°, -114.014°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Flathead County goes 6.9 hours a year without power, the 17th most of 35 counties in Montana. The county's page has the full outage record.

Who operates Hungry Horse?

It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.

When did Hungry Horse open?

Its oldest generator still running came online in 1952.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.