Solar power plant · Marion, IN
IND Community Solar Farm 1st Phase
IND Community Solar Farm 1st Phase is a 10 MW solar power plant in Marion County, Indiana, operated by Terraform Arcadia. Its oldest generator still running came online in 2013. In 2025 it generated 14 GWh, about what 1,200 average Indiana homes use in a year.
IND Community Solar Farm 1st Phase in context
Among the 124 solar plants in Indiana in the EIA's inventory, it is the 31st largest, about 0.2% of the state's 5.1 GW of solar capacity.
Marion County has 23 power plants of 1 MW or more with 1.5 GW in all; IND Community Solar Farm 1st Phase is 1% of that and the 2nd largest of 18 solar plants there.
Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Marion County goes 4.1 hours a year without power, the 45th most of 90 counties in Indiana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
IND Community Solar Farm 1st Phase (outlined) and other plants in Marion County, shaded. 39.695, -86.316.
Plant facts
- Operator
- Terraform Arcadia
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Marion County, IN
- EIA plant ID
- 58391
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 10 MW | 2013 | – |
Nearby
Other plants in Marion County
Questions
IND Community Solar Farm 1st Phase, answered
How much power does IND Community Solar Farm 1st Phase produce?
IND Community Solar Farm 1st Phase has 10 MW of capacity from one generator. In 2025 it generated 14 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does IND Community Solar Farm 1st Phase power?
Its 2025 output of 14 GWh equals the yearly electricity use of about 1,200 average Indiana homes (938 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is IND Community Solar Farm 1st Phase?
IND Community Solar Farm 1st Phase is in Marion County, Indiana, at about 39.695°, -86.316°. It is one of 23 power plants of 1 MW or more in the county. The average electricity customer in Marion County goes 4.1 hours a year without power, the 45th most of 90 counties in Indiana. The county's page has the full outage record.
Who operates IND Community Solar Farm 1st Phase?
It is operated by Terraform Arcadia (EIA sector: IPP Non-CHP), and it feeds MISO.
When did IND Community Solar Farm 1st Phase open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Indiana home's 938 kWh a month in 2025. Methodology.