Natural gas power plant · Kings, NY
Joseph J Seymour Power Project
Joseph J Seymour Power Project is a 94 MW natural gas power plant in Kings County, New York, operated by New York Power Authority. Its oldest generator still running came online in 2001. In 2025 it generated 99 GWh, about what 14,000 average New York homes use in a year.
Joseph J Seymour Power Project in context
Among the 103 natural gas plants in New York in the EIA's inventory, it is the 41st largest, about 0.4% of the state's 24 GW of natural gas capacity.
Kings County has 22 power plants of 1 MW or more with 1.5 GW in all; Joseph J Seymour Power Project is 6% of that and the 3rd largest of 8 natural gas plants there.
Its capacity factor of 12% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Kings County goes 0.7 hours a year without power, the 61st most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Joseph J Seymour Power Project (outlined) and other plants in Kings County, shaded. 40.663, -74.000.
Plant facts
- Operator
- New York Power Authority
- Sector
- Electric Utility
- Grid operator
- NYIS
- County
- Kings County, NY
- EIA plant ID
- 7910
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 47 MW | 2001 | – |
| 2 | Natural Gas Fired Combustion Turbine | 47 MW | 2001 | – |
Nearby
Other plants in Kings County
Questions
Joseph J Seymour Power Project, answered
How much power does Joseph J Seymour Power Project produce?
Joseph J Seymour Power Project has 94 MW of capacity from 2 generators. In 2025 it generated 99 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does Joseph J Seymour Power Project power?
Its 2025 output of 99 GWh equals the yearly electricity use of about 14,000 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Joseph J Seymour Power Project?
Joseph J Seymour Power Project is in Kings County, New York, at about 40.663°, -74.000°. It is one of 22 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 0.7 hours a year without power, the 61st most of 62 counties in New York. The county's page has the full outage record.
Who operates Joseph J Seymour Power Project?
It is operated by New York Power Authority (EIA sector: Electric Utility), and it feeds the New York ISO.
When did Joseph J Seymour Power Project open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.