Solar power plant · Charles City, VA
Keydet Solar Center
Keydet Solar Center is a 120 MW solar power plant in Charles City County, Virginia, operated by AES Clean Energy. Its oldest generator still running came online in 2026.
Keydet Solar Center in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 13th largest, about 2.3% of the state's 5.3 GW of solar capacity.
Charles City County has 3 power plants of 1 MW or more with 309 MW in all; Keydet Solar Center is 39% of that and the 2nd largest of 2 solar plants there.
The average electricity customer in Charles City County goes 32 hours a year without power, the 16th most of 123 counties in Virginia. The county's page has the full outage record.
Where it is
Keydet Solar Center (outlined) and other plants in Charles City County, shaded. 37.437, -77.159.
Plant facts
- Operator
- AES Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Charles City County, VA
- EIA plant ID
- 68418
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| KEYDT | Solar Photovoltaic | 120 MW | 2026 | – |
Nearby
Other plants in Charles City County
Questions
Keydet Solar Center, answered
How much power does Keydet Solar Center produce?
Keydet Solar Center has 120 MW of capacity from one generator. No full year of generation is reported yet.
Where is Keydet Solar Center?
Keydet Solar Center is in Charles City County, Virginia, at about 37.437°, -77.159°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Charles City County goes 32 hours a year without power, the 16th most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Keydet Solar Center?
It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Keydet Solar Center open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.