Wind power plant · Lawrence, MO
Kings Point Wind Energy Center
Kings Point Wind Energy Center is a 149 MW wind power plant in Lawrence County, Missouri, operated by Empire District Electric Co. Its oldest generator still running came online in 2021. In 2025 it generated 503 GWh, about what 40,000 average Missouri homes use in a year.
Kings Point Wind Energy Center in context
Among the 14 wind plants in Missouri in the EIA's inventory, it is the 8th largest, about 6.1% of the state's 2.5 GW of wind capacity.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Lawrence County goes 16 hours a year without power, the 5th most of 110 counties in Missouri. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Kings Point Wind Energy Center (outlined) and other plants in Lawrence County, shaded. 37.270, -94.053.
Plant facts
- Operator
- Empire District Electric Co
- Sector
- Electric Utility
- Grid operator
- SWPP
- County
- Lawrence County, MO
- EIA plant ID
- 62475
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| KPW1 | Onshore Wind Turbine | 149 MW | 2021 | – |
Questions
Kings Point Wind Energy Center, answered
How much power does Kings Point Wind Energy Center produce?
Kings Point Wind Energy Center has 149 MW of capacity from one generator. In 2025 it generated 503 GWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Kings Point Wind Energy Center power?
Its 2025 output of 503 GWh equals the yearly electricity use of about 40,000 average Missouri homes (1,037 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Kings Point Wind Energy Center?
Kings Point Wind Energy Center is in Lawrence County, Missouri, at about 37.270°, -94.053°. The average electricity customer in Lawrence County goes 16 hours a year without power, the 5th most of 110 counties in Missouri. The county's page has the full outage record.
Who operates Kings Point Wind Energy Center?
It is operated by Empire District Electric Co (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.
When did Kings Point Wind Energy Center open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Missouri home's 1,037 kWh a month in 2025. Methodology.