Solar power plant · St. Clair, MI

Lake Iris Solar Project

Lake Iris Solar Project is a 100 MW solar power plant in St. Clair County, Michigan, operated by Lake Iris Solar, LLC. Its oldest generator still running came online in 2026.

Capacity100 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Lake Iris Solar Project in context

Among the 79 solar plants in Michigan in the EIA's inventory, it is the 15th largest, about 3.0% of the state's 3.3 GW of solar capacity.

St. Clair County has 10 power plants of 1 MW or more with 4.5 GW in all; Lake Iris Solar Project is 2% of that and the largest of 2 solar plants there.

The average electricity customer in St. Clair County goes 13 hours a year without power, the 45th most of 83 counties in Michigan. The county's page has the full outage record.

Where it is

Lake Iris Solar Project (outlined) and other plants in St. Clair County, shaded. 43.085, -82.687.

Plant facts

Operator
Lake Iris Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
St. Clair County, MI
EIA plant ID
66745
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LIS1 Solar Photovoltaic 100 MW 2026 –

Nearby

Other plants in St. Clair County

Belle River · 1.7 GWBlue Water Energy Center · 1.3 GWGreenwood (MI) · 1.1 GWDean · 358 MWSt Clair · 19 MWE.B. Eddy Paper Inc · 5.0 MWCargill Salt · 4.2 MWBlue Water Renewables Inc · 3.2 MW

Questions

Lake Iris Solar Project, answered

How much power does Lake Iris Solar Project produce?

Lake Iris Solar Project has 100 MW of capacity from one generator. No full year of generation is reported yet.

Where is Lake Iris Solar Project?

Lake Iris Solar Project is in St. Clair County, Michigan, at about 43.085°, -82.687°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in St. Clair County goes 13 hours a year without power, the 45th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Lake Iris Solar Project?

It is operated by Lake Iris Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Lake Iris Solar Project open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.