Wind power plant · Zapata, TX

Las Lomas Wind Project

Las Lomas Wind Project is a 202 MW wind power plant in Zapata County, Texas, operated by Engie North America. Its oldest generator still running came online in 2020. In 2025 it generated 583 GWh, about what 44,000 average Texas homes use in a year.

Capacity202 MWNameplate, September 2026
Generated583 GWhIn 2025
Capacity factor33%Share of the most it could make, 2025
Generators1Oldest from 2020

Las Lomas Wind Project in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 90th largest, about 0.4% of the state's 45 GW of wind capacity.

Zapata County has 4 power plants of 1 MW or more with 441 MW in all; Las Lomas Wind Project is 46% of that and the 2nd largest of 2 wind plants there.

Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Zapata County goes 13 hours a year without power, the 95th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0200400600800202020212022202320242025GWh 583
0200400600800202020212022202320242025583

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Las Lomas Wind Project (outlined) and other plants in Zapata County, shaded. 26.698, -99.057.

Plant facts

Operator
Engie North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Zapata County, TX
EIA plant ID
63101
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WTG Onshore Wind Turbine 202 MW 2020 –

Nearby

Other plants in Zapata County

Questions

Las Lomas Wind Project, answered

How much power does Las Lomas Wind Project produce?

Las Lomas Wind Project has 202 MW of capacity from one generator. In 2025 it generated 583 GWh, 33% of the most it could have made running flat out all year (its capacity factor).

How many homes does Las Lomas Wind Project power?

Its 2025 output of 583 GWh equals the yearly electricity use of about 44,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Las Lomas Wind Project?

Las Lomas Wind Project is in Zapata County, Texas, at about 26.698°, -99.057°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Zapata County goes 13 hours a year without power, the 95th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Las Lomas Wind Project?

It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Las Lomas Wind Project open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.