Wind power plant · Kossuth, IA

Ledyard Windpower, LLC

Ledyard Windpower, LLC is a 207 MW wind power plant in Kossuth County, Iowa, operated by Deriva Energy. Its oldest generator still running came online in 2022. In 2025 it generated 596 GWh, about what 58,000 average Iowa homes use in a year.

Capacity207 MWNameplate, September 2026
Generated596 GWhIn 2025
Capacity factor33%Share of the most it could make, 2025
Generators1Oldest from 2022

Ledyard Windpower, LLC in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 20th largest, about 1.5% of the state's 13 GW of wind capacity.

Kossuth County has 7 power plants of 1 MW or more with 462 MW in all; Ledyard Windpower, LLC is 45% of that and the largest of 5 wind plants there.

Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Kossuth County goes 1.6 hours a year without power, the 89th most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0002022202320242025GWh 596
02004006008001,0002022202320242025596

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ledyard Windpower, LLC (outlined) and other plants in Kossuth County, shaded. 43.430, -94.107.

Plant facts

Operator
Deriva Energy
Sector
IPP Non-CHP
Grid operator
MISO
County
Kossuth County, IA
EIA plant ID
65390
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LDYRD Onshore Wind Turbine 207 MW 2022 –

Nearby

Other plants in Kossuth County

Kossuth · 152 MWKossuth County Wind · 70 MWAlgona · 16 MWLakota Wind Wind Farm · 11 MWBancroft · 4.2 MWIowa Distributed Wind Generation Project · 2.3 MW

Questions

Ledyard Windpower, LLC, answered

How much power does Ledyard Windpower, LLC produce?

Ledyard Windpower, LLC has 207 MW of capacity from one generator. In 2025 it generated 596 GWh, 33% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ledyard Windpower, LLC power?

Its 2025 output of 596 GWh equals the yearly electricity use of about 58,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ledyard Windpower, LLC?

Ledyard Windpower, LLC is in Kossuth County, Iowa, at about 43.430°, -94.107°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Kossuth County goes 1.6 hours a year without power, the 89th most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Ledyard Windpower, LLC?

It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Ledyard Windpower, LLC open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.