Solar power plant · Frederick, MD
LeGore Bridge Solar Center
LeGore Bridge Solar Center is a 20 MW solar power plant in Frederick County, Maryland, operated by LeGore Bridge Solar Center, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 3.1 GWh, about what 274 average Maryland homes use in a year.
LeGore Bridge Solar Center in context
Among the 214 solar plants in Maryland in the EIA's inventory, it is the 14th largest, about 1.4% of the state's 1.4 GW of solar capacity.
Frederick County has 9 power plants of 1 MW or more with 87 MW in all; LeGore Bridge Solar Center is 23% of that and the 2nd largest of 9 solar plants there.
The average electricity customer in Frederick County goes 2.6 hours a year without power, the 16th most of 24 counties in Maryland. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
LeGore Bridge Solar Center (outlined) and other plants in Frederick County, shaded. 39.572, -77.308.
Plant facts
- Operator
- LeGore Bridge Solar Center, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Frederick County, MD
- EIA plant ID
- 61796
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LGBSC | Solar Photovoltaic | 20 MW | 2025 | – |
Nearby
Other plants in Frederick County
Questions
LeGore Bridge Solar Center, answered
How much power does LeGore Bridge Solar Center produce?
LeGore Bridge Solar Center has 20 MW of capacity from one generator. In 2025 it generated 3.1 GWh.
How many homes does LeGore Bridge Solar Center power?
Its 2025 output of 3.1 GWh equals the yearly electricity use of about 274 average Maryland homes (944 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is LeGore Bridge Solar Center?
LeGore Bridge Solar Center is in Frederick County, Maryland, at about 39.572°, -77.308°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Frederick County goes 2.6 hours a year without power, the 16th most of 24 counties in Maryland. The county's page has the full outage record.
Who operates LeGore Bridge Solar Center?
It is operated by LeGore Bridge Solar Center, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did LeGore Bridge Solar Center open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Maryland home's 944 kWh a month in 2025. Methodology.