Solar power plant · Frederick, MD

LeGore Bridge Solar Center

LeGore Bridge Solar Center is a 20 MW solar power plant in Frederick County, Maryland, operated by LeGore Bridge Solar Center, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 3.1 GWh, about what 274 average Maryland homes use in a year.

Capacity20 MWNameplate, September 2026
Generated3.1 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

LeGore Bridge Solar Center in context

Among the 214 solar plants in Maryland in the EIA's inventory, it is the 14th largest, about 1.4% of the state's 1.4 GW of solar capacity.

Frederick County has 9 power plants of 1 MW or more with 87 MW in all; LeGore Bridge Solar Center is 23% of that and the 2nd largest of 9 solar plants there.

The average electricity customer in Frederick County goes 2.6 hours a year without power, the 16th most of 24 counties in Maryland. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

LeGore Bridge Solar Center (outlined) and other plants in Frederick County, shaded. 39.572, -77.308.

Plant facts

Operator
LeGore Bridge Solar Center, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Frederick County, MD
EIA plant ID
61796
Where Maryland's power comes from → Maryland power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LGBSC Solar Photovoltaic 20 MW 2025 –

Nearby

Other plants in Frederick County

Fort Detrick Solar PV · 22 MWBiggs Ford Solar Center · 15 MWMount Saint Mary's · 14 MWBaker Point · 9.0 MWFrederick County - Landfill · 2.0 MWCannonball Solar (CSG) · 2.0 MWEmmitsburg Solar Arrays · 1.7 MWFrancis Scott Key Mall · 1.6 MW

Questions

LeGore Bridge Solar Center, answered

How much power does LeGore Bridge Solar Center produce?

LeGore Bridge Solar Center has 20 MW of capacity from one generator. In 2025 it generated 3.1 GWh.

How many homes does LeGore Bridge Solar Center power?

Its 2025 output of 3.1 GWh equals the yearly electricity use of about 274 average Maryland homes (944 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is LeGore Bridge Solar Center?

LeGore Bridge Solar Center is in Frederick County, Maryland, at about 39.572°, -77.308°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Frederick County goes 2.6 hours a year without power, the 16th most of 24 counties in Maryland. The county's page has the full outage record.

Who operates LeGore Bridge Solar Center?

It is operated by LeGore Bridge Solar Center, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did LeGore Bridge Solar Center open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Maryland home's 944 kWh a month in 2025. Methodology.