Solar power plant · Liberty, TX
Liberty County Solar Project
Liberty County Solar Project is a 110 MW solar power plant in Liberty County, Texas, operated by Liberty County Solar Project, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 245 GWh, about what 18,000 average Texas homes use in a year.
Liberty County Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 137th largest, about 0.3% of the state's 37 GW of solar capacity.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Liberty County goes 24 hours a year without power, the 29th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Liberty County Solar Project (outlined) and other plants in Liberty County, shaded. 29.959, -94.850.
Plant facts
- Operator
- Liberty County Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Liberty County, TX
- EIA plant ID
- 67159
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LIBCO | Solar Photovoltaic | 110 MW | 2024 | – |
Questions
Liberty County Solar Project, answered
How much power does Liberty County Solar Project produce?
Liberty County Solar Project has 110 MW of capacity from one generator. In 2025 it generated 245 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Liberty County Solar Project power?
Its 2025 output of 245 GWh equals the yearly electricity use of about 18,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Liberty County Solar Project?
Liberty County Solar Project is in Liberty County, Texas, at about 29.959°, -94.850°. The average electricity customer in Liberty County goes 24 hours a year without power, the 29th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Liberty County Solar Project?
It is operated by Liberty County Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Liberty County Solar Project open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.