Wind power plant · Schleicher, TX
Live Oak Wind Project
Live Oak Wind Project is a 200 MW wind power plant in Schleicher County, Texas, operated by Engie North America. Its oldest generator still running came online in 2019. In 2025 it generated 792 GWh, about what 59,000 average Texas homes use in a year.
Live Oak Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 109th largest, about 0.4% of the state's 45 GW of wind capacity.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Schleicher County goes 8.3 hours a year without power, the 137th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Live Oak Wind Project (outlined) and other plants in Schleicher County, shaded. 31.049, -100.623.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Schleicher County, TX
- EIA plant ID
- 61782
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTGS | Onshore Wind Turbine | 200 MW | 2019 | – |
Questions
Live Oak Wind Project, answered
How much power does Live Oak Wind Project produce?
Live Oak Wind Project has 200 MW of capacity from one generator. In 2025 it generated 792 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Live Oak Wind Project power?
Its 2025 output of 792 GWh equals the yearly electricity use of about 59,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Live Oak Wind Project?
Live Oak Wind Project is in Schleicher County, Texas, at about 31.049°, -100.623°. The average electricity customer in Schleicher County goes 8.3 hours a year without power, the 137th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Live Oak Wind Project?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Live Oak Wind Project open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.