Wind power plant · Comanche, TX

Logans Gap Wind LLC

Logans Gap Wind LLC is a 200 MW wind power plant in Comanche County, Texas, operated by Pattern Operators LP. Its oldest generator still running came online in 2015. In 2025 it generated 604 GWh, about what 45,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated604 GWhIn 2025
Capacity factor35%Share of the most it could make, 2025
Generators1Oldest from 2015

Logans Gap Wind LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 97th largest, about 0.4% of the state's 45 GW of wind capacity.

Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Comanche County goes 16 hours a year without power, the 63rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 604
02004006008002019202120232025604

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Logans Gap Wind LLC (outlined) and other plants in Comanche County, shaded. 31.823, -98.691.

Plant facts

Operator
Pattern Operators LP
Sector
IPP Non-CHP
Grid operator
ERCO
County
Comanche County, TX
EIA plant ID
59442
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 200 MW 2015 –

Questions

Logans Gap Wind LLC, answered

How much power does Logans Gap Wind LLC produce?

Logans Gap Wind LLC has 200 MW of capacity from one generator. In 2025 it generated 604 GWh, 35% of the most it could have made running flat out all year (its capacity factor).

How many homes does Logans Gap Wind LLC power?

Its 2025 output of 604 GWh equals the yearly electricity use of about 45,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Logans Gap Wind LLC?

Logans Gap Wind LLC is in Comanche County, Texas, at about 31.823°, -98.691°. The average electricity customer in Comanche County goes 16 hours a year without power, the 63rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Logans Gap Wind LLC?

It is operated by Pattern Operators LP (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Logans Gap Wind LLC open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.