Natural gas power plant · Monroe, OH

Long Ridge Energy Generation

Long Ridge Energy Generation is a 522 MW natural gas power plant in Monroe County, Ohio, operated by Long Ridge Energy Generation LLC. Its oldest generator still running came online in 2021. In 2025 it generated 3.8 TWh, about what 363,000 average Ohio homes use in a year.

Capacity522 MWNameplate, September 2026
Generated3.8 TWhIn 2025
Capacity factor83%Share of the most it could make, 2025
Generators1Oldest from 2021

Long Ridge Energy Generation in context

Among the 48 natural gas plants in Ohio in the EIA's inventory, it is the 21st largest, about 2.7% of the state's 20 GW of natural gas capacity.

Monroe County has 2 power plants of 1 MW or more with 530 MW in all; Long Ridge Energy Generation is 99% of that.

Its capacity factor of 83% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Monroe County goes 11 hours a year without power, the 11th most of 88 counties in Ohio. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01,0002,0003,0004,0005,00020212022202320242025GWh 3,809
01,0002,0003,0004,0005,000202120222023202420253,809

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Long Ridge Energy Generation (outlined) and other plants in Monroe County, shaded. 39.703, -80.846.

Plant facts

Operator
Long Ridge Energy Generation LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Monroe County, OH
EIA plant ID
61322
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HPPP1 Natural Gas Fired Combined Cycle 522 MW 2021 –

Nearby

Other plants in Monroe County

Anadarko · 7.8 MW

Questions

Long Ridge Energy Generation, answered

How much power does Long Ridge Energy Generation produce?

Long Ridge Energy Generation has 522 MW of capacity from one generator. In 2025 it generated 3.8 TWh, 83% of the most it could have made running flat out all year (its capacity factor).

How many homes does Long Ridge Energy Generation power?

Its 2025 output of 3.8 TWh equals the yearly electricity use of about 363,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Long Ridge Energy Generation?

Long Ridge Energy Generation is in Monroe County, Ohio, at about 39.703°, -80.846°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Monroe County goes 11 hours a year without power, the 11th most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Long Ridge Energy Generation?

It is operated by Long Ridge Energy Generation LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Long Ridge Energy Generation open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.