Wind power plant · Briscoe, TX
Longhorn Wind
Longhorn Wind is a 200 MW wind power plant in Briscoe County, Texas, operated by Boralex US Operations LLC. Its oldest generator still running came online in 2015. In 2025 it generated 697 GWh, about what 52,000 average Texas homes use in a year.
Longhorn Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 101st largest, about 0.4% of the state's 45 GW of wind capacity.
Briscoe County has 2 power plants of 1 MW or more with 350 MW in all; Longhorn Wind is 57% of that and the largest of 2 wind plants there.
Its capacity factor of 40% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Briscoe County goes 30 hours a year without power, the 18th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Longhorn Wind (outlined) and other plants in Briscoe County, shaded. 34.311, -101.251.
Plant facts
- Operator
- Boralex US Operations LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Briscoe County, TX
- EIA plant ID
- 58772
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 200 MW | 2015 | – |
Nearby
Other plants in Briscoe County
Questions
Longhorn Wind, answered
How much power does Longhorn Wind produce?
Longhorn Wind has 200 MW of capacity from one generator. In 2025 it generated 697 GWh, 40% of the most it could have made running flat out all year (its capacity factor).
How many homes does Longhorn Wind power?
Its 2025 output of 697 GWh equals the yearly electricity use of about 52,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Longhorn Wind?
Longhorn Wind is in Briscoe County, Texas, at about 34.311°, -101.251°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Briscoe County goes 30 hours a year without power, the 18th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Longhorn Wind?
It is operated by Boralex US Operations LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Longhorn Wind open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.