Los Vientos Windpower III is a 200 MW wind power plant in Starr County, Texas, operated by Deriva Energy. Its oldest generator still running came online in 2015. In 2025 it generated 448 GWh, about what 34,000 average Texas homes use in a year.
Los Vientos Windpower III in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 104th largest, about 0.4% of the state's 45 GW of wind capacity.
Starr County has 12 power plants of 1 MW or more with 1.2 GW in all; Los Vientos Windpower III is 17% of that and the 3rd largest of 5 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Starr County goes 6.9 hours a year without power, the 168th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Los Vientos Windpower III (outlined) and other plants in Starr County, shaded. 26.389, -98.806.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Starr County, TX
- EIA plant ID
- 59320
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 200 MW | 2015 | – |
Questions
Los Vientos Windpower III, answered
How much power does Los Vientos Windpower III produce?
Los Vientos Windpower III has 200 MW of capacity from one generator. In 2025 it generated 448 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Los Vientos Windpower III power?
Its 2025 output of 448 GWh equals the yearly electricity use of about 34,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Los Vientos Windpower III?
Los Vientos Windpower III is in Starr County, Texas, at about 26.389°, -98.806°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Starr County goes 6.9 hours a year without power, the 168th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Los Vientos Windpower III?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Los Vientos Windpower III open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.