Hydro power plant · Skagit, WA

Lower Baker

Lower Baker is a 104 MW hydro power plant in Skagit County, Washington, operated by Puget Sound Energy Inc. Its oldest generator still running came online in 1960. In 2025 it generated 365 GWh, about what 32,000 average Washington homes use in a year.

Capacity104 MWNameplate, September 2026
Generated365 GWhIn 2025
Capacity factor40%Share of the most it could make, 2025
Generators2Oldest from 1960

Lower Baker in context

Among the 73 hydro plants in Washington in the EIA's inventory, it is the 23rd largest, about 0.5% of the state's 22 GW of hydro capacity.

Skagit County has 4 power plants of 1 MW or more with 648 MW in all; Lower Baker is 16% of that.

Its capacity factor of 40% in 2025 is higher than the 34% typical for hydro plants across the US.

The average electricity customer in Skagit County goes 8.6 hours a year without power, the 12th most of 31 counties in Washington. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 365
01002003004005002019202120232025365

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lower Baker (outlined) and other plants in Skagit County, shaded. 48.548, -121.741.

Plant facts

Operator
Puget Sound Energy Inc
Sector
Electric Utility
Grid operator
PSEI
County
Skagit County, WA
EIA plant ID
3855
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
3 Conventional Hydroelectric 81 MW 1960 –
4 Conventional Hydroelectric 23 MW 2013 –

Questions

Lower Baker, answered

How much power does Lower Baker produce?

Lower Baker has 104 MW of capacity from 2 generators. In 2025 it generated 365 GWh, 40% of the most it could have made running flat out all year (its capacity factor).

How many homes does Lower Baker power?

Its 2025 output of 365 GWh equals the yearly electricity use of about 32,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lower Baker?

Lower Baker is in Skagit County, Washington, at about 48.548°, -121.741°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Skagit County goes 8.6 hours a year without power, the 12th most of 31 counties in Washington. The county's page has the full outage record.

Who operates Lower Baker?

It is operated by Puget Sound Energy Inc (EIA sector: Electric Utility), and it feeds balancing authority PSEI.

When did Lower Baker open?

Its oldest generator still running came online in 1960.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.