Hydro power plant · Whitman, WA
Lower Granite
Lower Granite is a 810 MW hydro power plant in Whitman County, Washington, operated by USACE Northwestern Division. Its oldest generator still running came online in 1975. In 2025 it generated 1.5 TWh, about what 129,000 average Washington homes use in a year.
Lower Granite in context
Among the 73 hydro plants in Washington in the EIA's inventory, it is the 10th largest, about 3.7% of the state's 22 GW of hydro capacity.
Whitman County has 4 power plants of 1 MW or more with 920 MW in all; Lower Granite is 88% of that.
Its capacity factor of 21% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Whitman County goes 2.0 hours a year without power, the 26th most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Lower Granite (outlined) and other plants in Whitman County, shaded. 46.660, -117.429.
Plant facts
- Operator
- USACE Northwestern Division
- Sector
- Electric Utility
- Grid operator
- BPAT
- County
- Whitman County, WA
- EIA plant ID
- 6175
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 135 MW | 1975 | – |
| 2 | Conventional Hydroelectric | 135 MW | 1975 | – |
| 3 | Conventional Hydroelectric | 135 MW | 1975 | – |
| 4 | Conventional Hydroelectric | 135 MW | 1978 | – |
| 5 | Conventional Hydroelectric | 135 MW | 1978 | – |
| 6 | Conventional Hydroelectric | 135 MW | 1978 | – |
Nearby
Other plants in Whitman County
Questions
Lower Granite, answered
How much power does Lower Granite produce?
Lower Granite has 810 MW of capacity from 6 generators. In 2025 it generated 1.5 TWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Lower Granite power?
Its 2025 output of 1.5 TWh equals the yearly electricity use of about 129,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Lower Granite?
Lower Granite is in Whitman County, Washington, at about 46.660°, -117.429°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Whitman County goes 2.0 hours a year without power, the 26th most of 31 counties in Washington. The county's page has the full outage record.
Who operates Lower Granite?
It is operated by USACE Northwestern Division (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.
When did Lower Granite open?
Its oldest generator still running came online in 1975.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.