Wind power plant · Webster, IA
Lundgren Wind Project
Lundgren Wind Project is a 271 MW wind power plant in Webster County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2014. In 2025 it generated 605 GWh, about what 59,000 average Iowa homes use in a year.
Lundgren Wind Project in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 12th largest, about 2.0% of the state's 13 GW of wind capacity.
Webster County has 5 power plants of 1 MW or more with 380 MW in all; Lundgren Wind Project is 71% of that.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Webster County goes 2.6 hours a year without power, the 63rd most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Lundgren Wind Project (outlined) and other plants in Webster County, shaded. 42.335, -94.171.
Plant facts
- Operator
- MidAmerican Energy Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Webster County, IA
- EIA plant ID
- 58884
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LGWF | Onshore Wind Turbine | 271 MW | 2014 | – |
Nearby
Other plants in Webster County
Questions
Lundgren Wind Project, answered
How much power does Lundgren Wind Project produce?
Lundgren Wind Project has 271 MW of capacity from one generator. In 2025 it generated 605 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Lundgren Wind Project power?
Its 2025 output of 605 GWh equals the yearly electricity use of about 59,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Lundgren Wind Project?
Lundgren Wind Project is in Webster County, Iowa, at about 42.335°, -94.171°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Webster County goes 2.6 hours a year without power, the 63rd most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Lundgren Wind Project?
It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.
When did Lundgren Wind Project open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.