Hydro power plant · Grant, WA
Main Canal Headworks
Main Canal Headworks is a 27 MW hydro power plant in Grant County, Washington, operated by Columbia Basin Hydropower. Its oldest generator still running came online in 1987. In 2025 it generated 105 GWh, about what 9,300 average Washington homes use in a year.
Main Canal Headworks in context
Among the 73 hydro plants in Washington in the EIA's inventory, it is the 39th largest, about 0.1% of the state's 22 GW of hydro capacity.
Grant County has 5 power plants of 1 MW or more with 9.1 GW in all; Main Canal Headworks is 0% of that and the 5th largest of 5 hydro plants there.
Its capacity factor of 45% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Grant County goes 0.3 hours a year without power, the 31st most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Main Canal Headworks (outlined) and other plants in Grant County, shaded. 47.616, -119.299.
Plant facts
- Operator
- Columbia Basin Hydropower
- Sector
- Electric Utility
- Grid operator
- AVA
- County
- Grant County, WA
- EIA plant ID
- 56698
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 27 MW | 1987 | – |
Nearby
Other plants in Grant County
Questions
Main Canal Headworks, answered
How much power does Main Canal Headworks produce?
Main Canal Headworks has 27 MW of capacity from one generator. In 2025 it generated 105 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Main Canal Headworks power?
Its 2025 output of 105 GWh equals the yearly electricity use of about 9,300 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Main Canal Headworks?
Main Canal Headworks is in Grant County, Washington, at about 47.616°, -119.299°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Grant County goes 0.3 hours a year without power, the 31st most of 31 counties in Washington. The county's page has the full outage record.
Who operates Main Canal Headworks?
It is operated by Columbia Basin Hydropower (EIA sector: Electric Utility), and it feeds balancing authority AVA.
When did Main Canal Headworks open?
Its oldest generator still running came online in 1987.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.