Solar power plant · Marion, OH
Marion County Solar Project
Marion County Solar Project is a 100 MW solar power plant in Marion County, Ohio, operated by Marion County Solar Project, LLC. Its oldest generator still running came online in 2026.
Marion County Solar Project in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 21st largest, about 2.0% of the state's 5.0 GW of solar capacity.
Marion County has 4 power plants of 1 MW or more with 114 MW in all; Marion County Solar Project is 88% of that.
The average electricity customer in Marion County goes 2.1 hours a year without power, the 83rd most of 88 counties in Ohio. The county's page has the full outage record.
Where it is
Marion County Solar Project (outlined) and other plants in Marion County, shaded. 40.625, -83.136.
Plant facts
- Operator
- Marion County Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Marion County, OH
- EIA plant ID
- 66860
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| USMNC | Solar Photovoltaic | 100 MW | 2026 | – |
Nearby
Other plants in Marion County
Questions
Marion County Solar Project, answered
How much power does Marion County Solar Project produce?
Marion County Solar Project has 100 MW of capacity from one generator. No full year of generation is reported yet.
Where is Marion County Solar Project?
Marion County Solar Project is in Marion County, Ohio, at about 40.625°, -83.136°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Marion County goes 2.1 hours a year without power, the 83rd most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Marion County Solar Project?
It is operated by Marion County Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Marion County Solar Project open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.