Solar power plant · Defiance, OH

Mark Center Solar Project

Mark Center Solar Project is a 94 MW solar power plant in Defiance County, Ohio, operated by Naturgy Solar Operation USA LLC. Its oldest generator still running came online in 2026.

Capacity94 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Mark Center Solar Project in context

Among the 77 solar plants in Ohio in the EIA's inventory, it is the 24th largest, about 1.9% of the state's 5.0 GW of solar capacity.

Defiance County has 3 power plants of 1 MW or more with 548 MW in all; Mark Center Solar Project is 17% of that.

The average electricity customer in Defiance County goes 3.8 hours a year without power, the 59th most of 88 counties in Ohio. The county's page has the full outage record.

Where it is

Mark Center Solar Project (outlined) and other plants in Defiance County, shaded. 41.288, -84.611.

Plant facts

Operator
Naturgy Solar Operation USA LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Defiance County, OH
EIA plant ID
65050
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MRC1 Solar Photovoltaic 94 MW 2026 –

Nearby

Other plants in Defiance County

Richland (OH) · 450 MWAuglaize Hydro · 3.6 MW

Questions

Mark Center Solar Project, answered

How much power does Mark Center Solar Project produce?

Mark Center Solar Project has 94 MW of capacity from one generator. No full year of generation is reported yet.

Where is Mark Center Solar Project?

Mark Center Solar Project is in Defiance County, Ohio, at about 41.288°, -84.611°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Defiance County goes 3.8 hours a year without power, the 59th most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Mark Center Solar Project?

It is operated by Naturgy Solar Operation USA LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Mark Center Solar Project open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.