McGinness Hills 3 is a 99 MW geothermal power plant in Lander County, Nevada, operated by Ormat Nevada Inc. Its oldest generator still running came online in 2018. In 2025 it generated 434 GWh, about what 42,000 average Nevada homes use in a year.
McGinness Hills 3 in context
Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 2nd largest, about 9.6% of the state's 1.0 GW of other-fuel capacity.
Lander County has 3 power plants of 1 MW or more with 238 MW in all; McGinness Hills 3 is 42% of that and the 2nd largest of 3 geothermal plants there.
Its capacity factor of 50% in 2025 is higher than the 25% typical for geothermal plants across the US.
The average electricity customer in Lander County goes 12 hours a year without power, the 1st most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
McGinness Hills 3 (outlined) and other plants in Lander County, shaded. 39.596, -116.894.
Plant facts
- Operator
- Ormat Nevada Inc
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Lander County, NV
- EIA plant ID
- 61912
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OEC31 | Geothermal | 37 MW | 2018 | – |
| OEC32 | Geothermal | 37 MW | 2018 | – |
| G1A | Geothermal | 25 MW | 2021 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| MHSOL | Solar Photovoltaic | 14 MW | 2027 |
Nearby
Other plants in Lander County
Questions
McGinness Hills 3, answered
How much power does McGinness Hills 3 produce?
McGinness Hills 3 has 99 MW of capacity from 3 generators. In 2025 it generated 434 GWh, 50% of the most it could have made running flat out all year (its capacity factor).
How many homes does McGinness Hills 3 power?
Its 2025 output of 434 GWh equals the yearly electricity use of about 42,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is McGinness Hills 3?
McGinness Hills 3 is in Lander County, Nevada, at about 39.596°, -116.894°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Lander County goes 12 hours a year without power, the 1st most of 12 counties in Nevada. The county's page has the full outage record.
Who operates McGinness Hills 3?
It is operated by Ormat Nevada Inc (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did McGinness Hills 3 open?
Its oldest generator still running came online in 2018. 1 more generator is planned.