Biomass power plant · Clallam, WA
McKinley Paper Co. - Washington Mill
McKinley Paper Co. - Washington Mill is a 13 MW biomass power plant in Clallam County, Washington, operated by McKinley Paper Co. - Washington Mill. Its oldest generator still running came online in 2022.
McKinley Paper Co. - Washington Mill in context
Among the 16 other-fuel plants in Washington in the EIA's inventory, it is the 9th largest, about 4.1% of the state's 310 MW of other-fuel capacity.
The average electricity customer in Clallam County goes 9.0 hours a year without power, the 10th most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
McKinley Paper Co. - Washington Mill (outlined) and other plants in Clallam County, shaded. 48.135, -123.466.
Plant facts
- Operator
- McKinley Paper Co. - Washington Mill
- Sector
- Industrial Non-CHP
- Grid operator
- BPAT
- County
- Clallam County, WA
- EIA plant ID
- 58352
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| G-11A | Wood/Wood Waste Biomass | 13 MW | 2022 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| G-11 | Wood/Wood Waste Biomass | 20 MW | 2013 | 2017 |
Questions
McKinley Paper Co. - Washington Mill, answered
How much power does McKinley Paper Co. - Washington Mill produce?
McKinley Paper Co. - Washington Mill has 13 MW of capacity from one generator. No full year of generation is reported yet.
Where is McKinley Paper Co. - Washington Mill?
McKinley Paper Co. - Washington Mill is in Clallam County, Washington, at about 48.135°, -123.466°. The average electricity customer in Clallam County goes 9.0 hours a year without power, the 10th most of 31 counties in Washington. The county's page has the full outage record.
Who operates McKinley Paper Co. - Washington Mill?
It is operated by McKinley Paper Co. - Washington Mill (EIA sector: Industrial Non-CHP), and it feeds the Bonneville Power Administration.
When did McKinley Paper Co. - Washington Mill open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Methodology.