Solar power plant · Nye, NV
MDU / NVSS-II
MDU / NVSS-II is a 14 MW solar power plant in Nye County, Nevada, operated by Greenbacker Renewable Energy Corporation. Its oldest generator still running came online in 2017. In 2025 it generated 32 GWh, about what 3,000 average Nevada homes use in a year.
MDU / NVSS-II in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 43rd largest, about 0.2% of the state's 6.2 GW of solar capacity.
Nye County has 3 power plants of 1 MW or more with 242 MW in all; MDU / NVSS-II is 6% of that and the 3rd largest of 3 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Nye County goes 1.7 hours a year without power, the 11th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
MDU / NVSS-II (outlined) and other plants in Nye County, shaded. 36.275, -115.972.
Plant facts
- Operator
- Greenbacker Renewable Energy Corporation
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Nye County, NV
- EIA plant ID
- 66983
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 822 | Solar Photovoltaic | 14 MW | 2017 | – |
Nearby
Other plants in Nye County
Questions
MDU / NVSS-II, answered
How much power does MDU / NVSS-II produce?
MDU / NVSS-II has 14 MW of capacity from one generator. In 2025 it generated 32 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does MDU / NVSS-II power?
Its 2025 output of 32 GWh equals the yearly electricity use of about 3,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is MDU / NVSS-II?
MDU / NVSS-II is in Nye County, Nevada, at about 36.275°, -115.972°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Nye County goes 1.7 hours a year without power, the 11th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates MDU / NVSS-II?
It is operated by Greenbacker Renewable Energy Corporation (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did MDU / NVSS-II open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.