Wind power plant · White, IN

Meadow Lake Wind Farm II LLC

Meadow Lake Wind Farm II LLC is a 102 MW wind power plant in White County, Indiana, operated by Meadow Lake Wind Farm II LLC. Its oldest generator still running came online in 2010. In 2025 it generated 238 GWh, about what 21,000 average Indiana homes use in a year.

Capacity102 MWNameplate, September 2026
Generated238 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2010

Meadow Lake Wind Farm II LLC in context

Among the 20 wind plants in Indiana in the EIA's inventory, it is the 18th largest, about 2.7% of the state's 3.9 GW of wind capacity.

White County has 14 power plants of 1 MW or more with 1.8 GW in all; Meadow Lake Wind Farm II LLC is 6% of that and the 6th largest of 8 wind plants there.

Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in White County goes 2.8 hours a year without power, the 60th most of 90 counties in Indiana. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030020182019202020212022202320242025GWh 238
01002003002019202120232025238

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Meadow Lake Wind Farm II LLC (outlined) and other plants in White County, shaded. 40.643, -87.024.

Plant facts

Operator
Meadow Lake Wind Farm II LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
White County, IN
EIA plant ID
57112
Where Indiana's power comes from → Indiana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Onshore Wind Turbine 102 MW 2010 –

Questions

Meadow Lake Wind Farm II LLC, answered

How much power does Meadow Lake Wind Farm II LLC produce?

Meadow Lake Wind Farm II LLC has 102 MW of capacity from one generator. In 2025 it generated 238 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Meadow Lake Wind Farm II LLC power?

Its 2025 output of 238 GWh equals the yearly electricity use of about 21,000 average Indiana homes (938 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Meadow Lake Wind Farm II LLC?

Meadow Lake Wind Farm II LLC is in White County, Indiana, at about 40.643°, -87.024°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in White County goes 2.8 hours a year without power, the 60th most of 90 counties in Indiana. The county's page has the full outage record.

Who operates Meadow Lake Wind Farm II LLC?

It is operated by Meadow Lake Wind Farm II LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Meadow Lake Wind Farm II LLC open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Indiana home's 938 kWh a month in 2025. Methodology.