Wind power plant · Wyoming, PA
Mehoopany Wind Energy LLC
Mehoopany Wind Energy LLC is a 141 MW wind power plant in Wyoming County, Pennsylvania, operated by Clearlight Energy Holdings LP. Its oldest generator still running came online in 2012. In 2025 it generated 307 GWh, about what 30,000 average Pennsylvania homes use in a year.
Mehoopany Wind Energy LLC in context
Among the 28 wind plants in Pennsylvania in the EIA's inventory, it is the largest, about 8.4% of the state's 1.7 GW of wind capacity.
Wyoming County has 3 power plants of 1 MW or more with 283 MW in all; Mehoopany Wind Energy LLC is 50% of that.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Wyoming County goes 19 hours a year without power, the 6th most of 67 counties in Pennsylvania. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mehoopany Wind Energy LLC (outlined) and other plants in Wyoming County, shaded. 41.421, -76.049.
Plant facts
- Operator
- Clearlight Energy Holdings LP
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Wyoming County, PA
- EIA plant ID
- 57769
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 141 MW | 2012 | – |
Nearby
Other plants in Wyoming County
Questions
Mehoopany Wind Energy LLC, answered
How much power does Mehoopany Wind Energy LLC produce?
Mehoopany Wind Energy LLC has 141 MW of capacity from one generator. In 2025 it generated 307 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mehoopany Wind Energy LLC power?
Its 2025 output of 307 GWh equals the yearly electricity use of about 30,000 average Pennsylvania homes (839 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mehoopany Wind Energy LLC?
Mehoopany Wind Energy LLC is in Wyoming County, Pennsylvania, at about 41.421°, -76.049°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Wyoming County goes 19 hours a year without power, the 6th most of 67 counties in Pennsylvania. The county's page has the full outage record.
Who operates Mehoopany Wind Energy LLC?
It is operated by Clearlight Energy Holdings LP (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Mehoopany Wind Energy LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Pennsylvania home's 839 kWh a month in 2025. Methodology.