Hydro power plant · Cassia, ID
Milner Hydro
Milner Hydro is a 60 MW hydro power plant in Cassia County, Idaho, operated by Idaho Power Co. Its oldest generator still running came online in 1992. In 2025 it generated 34 GWh, about what 3,000 average Idaho homes use in a year.
Milner Hydro in context
Among the 76 hydro plants in Idaho in the EIA's inventory, it is the 10th largest, about 2.2% of the state's 2.7 GW of hydro capacity.
Cassia County has 6 power plants of 1 MW or more with 132 MW in all; Milner Hydro is 45% of that.
Its capacity factor of 7% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Cassia County goes 1.5 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Milner Hydro (outlined) and other plants in Cassia County, shaded. 42.527, -114.037.
Plant facts
- Operator
- Idaho Power Co
- Sector
- Electric Utility
- Grid operator
- IPCO
- County
- Cassia County, ID
- EIA plant ID
- 7190
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 47 MW | 1992 | – |
| 2 | Conventional Hydroelectric | 12 MW | 1992 | – |
| 3 | Conventional Hydroelectric | 0.8 MW | 1992 | – |
Nearby
Other plants in Cassia County
Questions
Milner Hydro, answered
How much power does Milner Hydro produce?
Milner Hydro has 60 MW of capacity from 3 generators. In 2025 it generated 34 GWh, 7% of the most it could have made running flat out all year (its capacity factor).
How many homes does Milner Hydro power?
Its 2025 output of 34 GWh equals the yearly electricity use of about 3,000 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Milner Hydro?
Milner Hydro is in Cassia County, Idaho, at about 42.527°, -114.037°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Cassia County goes 1.5 hours a year without power. The county's page has the full outage record.
Who operates Milner Hydro?
It is operated by Idaho Power Co (EIA sector: Electric Utility), and it feeds Idaho Power.
When did Milner Hydro open?
Its oldest generator still running came online in 1992.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.