Solar power plant · Leon, TX
Misae Solar IV LLC
Misae Solar IV LLC is a 209 MW solar power plant in Leon County, Texas, operated by Ferrovial Energy US. Its oldest generator still running came online in 2026.
Misae Solar IV LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 71st largest, about 0.6% of the state's 37 GW of solar capacity.
The average electricity customer in Leon County goes 45 hours a year without power, the 6th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Misae Solar IV LLC (outlined) and other plants in Leon County, shaded. 31.443, -95.752.
Plant facts
- Operator
- Ferrovial Energy US
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Leon County, TX
- EIA plant ID
- 70052
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LEON | Solar Photovoltaic | 209 MW | 2026 | – |
Questions
Misae Solar IV LLC, answered
How much power does Misae Solar IV LLC produce?
Misae Solar IV LLC has 209 MW of capacity from one generator. No full year of generation is reported yet.
Where is Misae Solar IV LLC?
Misae Solar IV LLC is in Leon County, Texas, at about 31.443°, -95.752°. The average electricity customer in Leon County goes 45 hours a year without power, the 6th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Misae Solar IV LLC?
It is operated by Ferrovial Energy US (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Misae Solar IV LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.