Solar power plant · Isabella, MI
Mission Road Solar Park
Mission Road Solar Park is a 172 MW solar power plant in Isabella County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 2026.
Mission Road Solar Park in context
Among the 79 solar plants in Michigan in the EIA's inventory, it is the 4th largest, about 5.2% of the state's 3.3 GW of solar capacity.
Isabella County has 4 power plants of 1 MW or more with 722 MW in all; Mission Road Solar Park is 24% of that.
The average electricity customer in Isabella County goes 5.8 hours a year without power, the 73rd most of 83 counties in Michigan. The county's page has the full outage record.
Where it is
Mission Road Solar Park (outlined) and other plants in Isabella County, shaded. 43.684, -84.785.
Plant facts
- Operator
- DTE Electric Company
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Isabella County, MI
- EIA plant ID
- 67756
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MSRSP | Solar Photovoltaic | 172 MW | 2026 | – |
Nearby
Other plants in Isabella County
Questions
Mission Road Solar Park, answered
How much power does Mission Road Solar Park produce?
Mission Road Solar Park has 172 MW of capacity from one generator. No full year of generation is reported yet.
Where is Mission Road Solar Park?
Mission Road Solar Park is in Isabella County, Michigan, at about 43.684°, -84.785°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Isabella County goes 5.8 hours a year without power, the 73rd most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Mission Road Solar Park?
It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.
When did Mission Road Solar Park open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.