Natural gas power plant · Oktibbeha, MS
Mississippi State University
Mississippi State University is a 26 MW natural gas power plant in Oktibbeha County, Mississippi, operated by Mississippi State University. Its oldest generator still running came online in 2005.
Mississippi State University in context
Among the 28 natural gas plants in Mississippi in the EIA's inventory, it is the 23rd largest, about 0.2% of the state's 14 GW of natural gas capacity.
The average electricity customer in Oktibbeha County goes 1.6 hours a year without power, the 69th most of 74 counties in Mississippi. The county's page has the full outage record.
Where it is
Mississippi State University (outlined) and other plants in Oktibbeha County, shaded. 33.452, -88.802.
Plant facts
- Operator
- Mississippi State University
- Sector
- Commercial Non-CHP
- Grid operator
- TVA
- County
- Oktibbeha County, MS
- EIA plant ID
- 68899
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 13 MW | 2005 | – |
| 2 | Natural Gas Fired Combustion Turbine | 13 MW | 2005 | – |
Questions
Mississippi State University, answered
How much power does Mississippi State University produce?
Mississippi State University has 26 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Mississippi State University?
Mississippi State University is in Oktibbeha County, Mississippi, at about 33.452°, -88.802°. The average electricity customer in Oktibbeha County goes 1.6 hours a year without power, the 69th most of 74 counties in Mississippi. The county's page has the full outage record.
Who operates Mississippi State University?
It is operated by Mississippi State University (EIA sector: Commercial Non-CHP), and it feeds the Tennessee Valley Authority.
When did Mississippi State University open?
Its oldest generator still running came online in 2005.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.