Natural gas power plant · Milwaukee, WI
MMSD Jones Island Wastewater
MMSD Jones Island Wastewater is a 31 MW natural gas power plant in Milwaukee County, Wisconsin, operated by Milwaukee Metro Sewerage Dist. Its oldest generator still running came online in 1971. In 2025 it generated 80 GWh, about what 10,000 average Wisconsin homes use in a year.
MMSD Jones Island Wastewater in context
Among the 38 natural gas plants in Wisconsin in the EIA's inventory, it is the 30th largest, about 0.4% of the state's 8.1 GW of natural gas capacity.
Milwaukee County has 9 power plants of 1 MW or more with 2.4 GW in all; MMSD Jones Island Wastewater is 1% of that and the 2nd largest of 2 natural gas plants there.
Its capacity factor of 29% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Milwaukee County goes 3.1 hours a year without power, the 34th most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
MMSD Jones Island Wastewater (outlined) and other plants in Milwaukee County, shaded. 43.021, -87.901.
Plant facts
- Operator
- Milwaukee Metro Sewerage Dist
- Sector
- Commercial CHP
- Grid operator
- MISO
- County
- Milwaukee County, WI
- EIA plant ID
- 54851
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combustion Turbine | 18 MW | 1971 | – |
| SOL1 | Natural Gas Fired Combustion Turbine | 4.6 MW | 2013 | – |
| SOL2 | Landfill Gas | 4.6 MW | 2013 | – |
| SOL3 | Landfill Gas | 4.6 MW | 2013 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| GEN2 | Natural Gas Fired Combustion Turbine | 18 MW | 1971 | 2013 |
Nearby
Other plants in Milwaukee County
Questions
MMSD Jones Island Wastewater, answered
How much power does MMSD Jones Island Wastewater produce?
MMSD Jones Island Wastewater has 31 MW of capacity from 4 generators. In 2025 it generated 80 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does MMSD Jones Island Wastewater power?
Its 2025 output of 80 GWh equals the yearly electricity use of about 10,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is MMSD Jones Island Wastewater?
MMSD Jones Island Wastewater is in Milwaukee County, Wisconsin, at about 43.021°, -87.901°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Milwaukee County goes 3.1 hours a year without power, the 34th most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates MMSD Jones Island Wastewater?
It is operated by Milwaukee Metro Sewerage Dist (EIA sector: Commercial CHP), and it feeds MISO.
When did MMSD Jones Island Wastewater open?
Its oldest generator still running came online in 1971.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.