Biomass power plant · Marathon, WI
Mosinee Mill
Mosinee Mill is a 23 MW biomass power plant in Marathon County, Wisconsin, operated by Ahlstrom-Munksjo NA Specialty Solutions, LLC. Its oldest generator still running came online in 1916. In 2025 it generated 118 GWh, about what 15,000 average Wisconsin homes use in a year.
Mosinee Mill in context
Among the 40 other-fuel plants in Wisconsin in the EIA's inventory, it is the 8th largest, about 2.1% of the state's 1.1 GW of other-fuel capacity.
Marathon County has 6 power plants of 1 MW or more with 1.2 GW in all; Mosinee Mill is 2% of that and the 2nd largest of 2 biomass plants there.
Its capacity factor of 58% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Marathon County goes 2.9 hours a year without power, the 39th most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mosinee Mill (outlined) and other plants in Marathon County, shaded. 44.788, -89.692.
Plant facts
- Operator
- Ahlstrom-Munksjo NA Specialty Solutions, LLC
- Sector
- Industrial CHP
- Grid operator
- MISO
- County
- Marathon County, WI
- EIA plant ID
- 50614
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Wood/Wood Waste Biomass | 15 MW | 1976 | – |
| WEST | Wood/Wood Waste Biomass | 5.0 MW | 1951 | – |
| HYD1 | Conventional Hydroelectric | 2.2 MW | 1924 | – |
| HYD2 | Conventional Hydroelectric | 0.6 MW | 1916 | – |
| HYD3 | Conventional Hydroelectric | 0.6 MW | 1916 | – |
Nearby
Other plants in Marathon County
Questions
Mosinee Mill, answered
How much power does Mosinee Mill produce?
Mosinee Mill has 23 MW of capacity from 5 generators. In 2025 it generated 118 GWh, 58% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mosinee Mill power?
Its 2025 output of 118 GWh equals the yearly electricity use of about 15,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mosinee Mill?
Mosinee Mill is in Marathon County, Wisconsin, at about 44.788°, -89.692°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Marathon County goes 2.9 hours a year without power, the 39th most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates Mosinee Mill?
It is operated by Ahlstrom-Munksjo NA Specialty Solutions, LLC (EIA sector: Industrial CHP), and it feeds MISO.
When did Mosinee Mill open?
Its oldest generator still running came online in 1916.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.