Mt. Jackson Solar is a 16 MW solar power plant in Shenandoah County, Virginia, operated by Energix Mt. Jackson, LLC.. Its oldest generator still running came online in 2021. In 2025 it generated 34 GWh, about what 2,600 average Virginia homes use in a year.

Capacity16 MWNameplate, September 2026
Generated34 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2021

Mt. Jackson Solar in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 82nd largest, about 0.3% of the state's 5.3 GW of solar capacity.

Shenandoah County has 2 power plants of 1 MW or more with 19 MW in all; Mt. Jackson Solar is 83% of that and the largest of 2 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Shenandoah County goes 7.8 hours a year without power, the 82nd most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304020212022202320242025GWh 34
0102030402021202220232024202534

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mt. Jackson Solar (outlined) and other plants in Shenandoah County, shaded. 38.740, -78.660.

Plant facts

Operator
Energix Mt. Jackson, LLC.
Sector
IPP Non-CHP
Grid operator
PJM
County
Shenandoah County, VA
EIA plant ID
61318
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SOLAR Solar Photovoltaic 16 MW 2021 –

Nearby

Other plants in Shenandoah County

Randolf Solar · 3.2 MW

Questions

Mt. Jackson Solar, answered

How much power does Mt. Jackson Solar produce?

Mt. Jackson Solar has 16 MW of capacity from one generator. In 2025 it generated 34 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mt. Jackson Solar power?

Its 2025 output of 34 GWh equals the yearly electricity use of about 2,600 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mt. Jackson Solar?

Mt. Jackson Solar is in Shenandoah County, Virginia, at about 38.740°, -78.660°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Shenandoah County goes 7.8 hours a year without power, the 82nd most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Mt. Jackson Solar?

It is operated by Energix Mt. Jackson, LLC. (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Mt. Jackson Solar open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.