Coal power plant · Muscatine, IA
Muscatine Plant #1
Muscatine Plant #1 is a 276 MW coal power plant in Muscatine County, Iowa, operated by Board of Water Electric & Communications. Its oldest generator still running came online in 1958. In 2025 it generated 748 GWh, about what 72,000 average Iowa homes use in a year.
Muscatine Plant #1 in context
Among the 8 coal plants in Iowa in the EIA's inventory, it is the 7th largest, about 5.3% of the state's 5.2 GW of coal capacity.
Muscatine County has 4 power plants of 1 MW or more with 301 MW in all; Muscatine Plant #1 is 92% of that.
Its capacity factor of 31% in 2025 is lower than the 45% typical for coal plants across the US.
The average electricity customer in Muscatine County goes 1.3 hours a year without power, the 94th most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Muscatine Plant #1 (outlined) and other plants in Muscatine County, shaded. 41.392, -91.057.
Plant facts
- Operator
- Board of Water Electric & Communications
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Muscatine County, IA
- EIA plant ID
- 1167
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 9 | Conventional Steam Coal | 176 MW | 1983 | – |
| 8 | Conventional Steam Coal | 75 MW | 1969 | – |
| 7 | Conventional Steam Coal | 25 MW | 1958 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| 10 | Natural Gas Fired Combustion Turbine | 35 MW | 2027 |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 8A | Conventional Steam Coal | 18 MW | 2000 | 2024 |
Nearby
Other plants in Muscatine County
Questions
Muscatine Plant #1, answered
How much power does Muscatine Plant #1 produce?
Muscatine Plant #1 has 276 MW of capacity from 3 generators. In 2025 it generated 748 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Muscatine Plant #1 power?
Its 2025 output of 748 GWh equals the yearly electricity use of about 72,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Muscatine Plant #1?
Muscatine Plant #1 is in Muscatine County, Iowa, at about 41.392°, -91.057°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Muscatine County goes 1.3 hours a year without power, the 94th most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Muscatine Plant #1?
It is operated by Board of Water Electric & Communications (EIA sector: Electric Utility), and it feeds MISO.
When did Muscatine Plant #1 open?
Its oldest generator still running came online in 1958. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.