Hydro power plant · Sullivan, NY
Neversink
Neversink is a 25 MW hydro power plant in Sullivan County, New York, operated by New York Power Authority. Its oldest generator still running came online in 1953. In 2025 it generated 12 GWh, about what 1,700 average New York homes use in a year.
Neversink in context
Among the 163 hydro plants in New York in the EIA's inventory, it is the 14th largest, about 0.5% of the state's 4.7 GW of hydro capacity.
Sullivan County has 25 power plants of 1 MW or more with 123 MW in all; Neversink is 20% of that and the largest of 6 hydro plants there.
Its capacity factor of 5% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Sullivan County goes 23 hours a year without power, the 4th most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Neversink (outlined) and other plants in Sullivan County, shaded. 41.819, -74.636.
Plant facts
- Operator
- New York Power Authority
- Sector
- Electric Utility
- Grid operator
- NYIS
- County
- Sullivan County, NY
- EIA plant ID
- 2483
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| H1 | Conventional Hydroelectric | 25 MW | 1953 | – |
Nearby
Other plants in Sullivan County
Questions
Neversink, answered
How much power does Neversink produce?
Neversink has 25 MW of capacity from one generator. In 2025 it generated 12 GWh, 5% of the most it could have made running flat out all year (its capacity factor).
How many homes does Neversink power?
Its 2025 output of 12 GWh equals the yearly electricity use of about 1,700 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Neversink?
Neversink is in Sullivan County, New York, at about 41.819°, -74.636°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Sullivan County goes 23 hours a year without power, the 4th most of 62 counties in New York. The county's page has the full outage record.
Who operates Neversink?
It is operated by New York Power Authority (EIA sector: Electric Utility), and it feeds the New York ISO.
When did Neversink open?
Its oldest generator still running came online in 1953.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.