Solar power plant · New Madrid, MO
New Madrid Solar, LLC
New Madrid Solar, LLC is a 200 MW solar power plant in New Madrid County, Missouri, operated by New Madrid Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 54 GWh, about what 4,300 average Missouri homes use in a year.
New Madrid Solar, LLC in context
Among the 38 solar plants in Missouri in the EIA's inventory, it is the 4th largest, about 11% of the state's 1.9 GW of solar capacity.
New Madrid County has 2 power plants of 1 MW or more with 1.5 GW in all; New Madrid Solar, LLC is 13% of that.
The average electricity customer in New Madrid County goes 4.9 hours a year without power, the 54th most of 110 counties in Missouri. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
New Madrid Solar, LLC (outlined) and other plants in New Madrid County, shaded. 36.500, -89.636.
Plant facts
- Operator
- New Madrid Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- New Madrid County, MO
- EIA plant ID
- 69166
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 3603 | Solar Photovoltaic | 200 MW | 2025 | – |
Nearby
Other plants in New Madrid County
Questions
New Madrid Solar, LLC, answered
How much power does New Madrid Solar, LLC produce?
New Madrid Solar, LLC has 200 MW of capacity from one generator. In 2025 it generated 54 GWh.
How many homes does New Madrid Solar, LLC power?
Its 2025 output of 54 GWh equals the yearly electricity use of about 4,300 average Missouri homes (1,037 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is New Madrid Solar, LLC?
New Madrid Solar, LLC is in New Madrid County, Missouri, at about 36.500°, -89.636°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in New Madrid County goes 4.9 hours a year without power, the 54th most of 110 counties in Missouri. The county's page has the full outage record.
Who operates New Madrid Solar, LLC?
It is operated by New Madrid Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did New Madrid Solar, LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Missouri home's 1,037 kWh a month in 2025. Methodology.