Solar power plant · New Madrid, MO

New Madrid Solar, LLC

New Madrid Solar, LLC is a 200 MW solar power plant in New Madrid County, Missouri, operated by New Madrid Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 54 GWh, about what 4,300 average Missouri homes use in a year.

Capacity200 MWNameplate, September 2026
Generated54 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

New Madrid Solar, LLC in context

Among the 38 solar plants in Missouri in the EIA's inventory, it is the 4th largest, about 11% of the state's 1.9 GW of solar capacity.

New Madrid County has 2 power plants of 1 MW or more with 1.5 GW in all; New Madrid Solar, LLC is 13% of that.

The average electricity customer in New Madrid County goes 4.9 hours a year without power, the 54th most of 110 counties in Missouri. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

New Madrid Solar, LLC (outlined) and other plants in New Madrid County, shaded. 36.500, -89.636.

Plant facts

Operator
New Madrid Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
New Madrid County, MO
EIA plant ID
69166
Where Missouri's power comes from → Missouri power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
3603 Solar Photovoltaic 200 MW 2025 –

Nearby

Other plants in New Madrid County

Questions

New Madrid Solar, LLC, answered

How much power does New Madrid Solar, LLC produce?

New Madrid Solar, LLC has 200 MW of capacity from one generator. In 2025 it generated 54 GWh.

How many homes does New Madrid Solar, LLC power?

Its 2025 output of 54 GWh equals the yearly electricity use of about 4,300 average Missouri homes (1,037 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is New Madrid Solar, LLC?

New Madrid Solar, LLC is in New Madrid County, Missouri, at about 36.500°, -89.636°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in New Madrid County goes 4.9 hours a year without power, the 54th most of 110 counties in Missouri. The county's page has the full outage record.

Who operates New Madrid Solar, LLC?

It is operated by New Madrid Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did New Madrid Solar, LLC open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Missouri home's 1,037 kWh a month in 2025. Methodology.