Hydro power plant · Anderson, TN
Norris Dam
Norris Dam is a 131 MW hydro power plant in Anderson County, Tennessee, operated by Tennessee Valley Authority. Its oldest generator still running came online in 1936. In 2025 it generated 416 GWh, about what 29,000 average Tennessee homes use in a year.
Norris Dam in context
Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the 9th largest, about 5.2% of the state's 2.5 GW of hydro capacity.
Anderson County has 2 power plants of 1 MW or more with 136 MW in all; Norris Dam is 96% of that.
Its capacity factor of 36% in 2025 is close to the 34% typical for hydro plants across the US.
The average electricity customer in Anderson County goes 1.3 hours a year without power, the 67th most of 73 counties in Tennessee. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Norris Dam (outlined) and other plants in Anderson County, shaded. 36.224, -84.091.
Plant facts
- Operator
- Tennessee Valley Authority
- Sector
- Electric Utility
- Grid operator
- TVA
- County
- Anderson County, TN
- EIA plant ID
- 3411
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 66 MW | 1936 | – |
| 2 | Conventional Hydroelectric | 66 MW | 1936 | – |
Nearby
Other plants in Anderson County
Questions
Norris Dam, answered
How much power does Norris Dam produce?
Norris Dam has 131 MW of capacity from 2 generators. In 2025 it generated 416 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Norris Dam power?
Its 2025 output of 416 GWh equals the yearly electricity use of about 29,000 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Norris Dam?
Norris Dam is in Anderson County, Tennessee, at about 36.224°, -84.091°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Anderson County goes 1.3 hours a year without power, the 67th most of 73 counties in Tennessee. The county's page has the full outage record.
Who operates Norris Dam?
It is operated by Tennessee Valley Authority (EIA sector: Electric Utility), and it feeds the Tennessee Valley Authority.
When did Norris Dam open?
Its oldest generator still running came online in 1936.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.