Solar power plant · Montgomery, AL
Old Hayneville Solar, LLC
Old Hayneville Solar, LLC is a 80 MW solar power plant in Montgomery County, Alabama, operated by Modal Power LLC. Its oldest generator still running came online in 2026.
Old Hayneville Solar, LLC in context
Among the 15 solar plants in Alabama in the EIA's inventory, it is the 5th largest, about 8.1% of the state's 987 MW of solar capacity.
Montgomery County has 2 power plants of 1 MW or more with 180 MW in all; Old Hayneville Solar, LLC is 44% of that and the 2nd largest of 2 solar plants there.
The average electricity customer in Montgomery County goes 3.9 hours a year without power, the 47th most of 60 counties in Alabama. The county's page has the full outage record.
Where it is
Old Hayneville Solar, LLC (outlined) and other plants in Montgomery County, shaded. 32.318, -86.411.
Plant facts
- Operator
- Modal Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- SOCO
- County
- Montgomery County, AL
- EIA plant ID
- 68001
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OLHAY | Solar Photovoltaic | 80 MW | 2026 | – |
Nearby
Other plants in Montgomery County
Questions
Old Hayneville Solar, LLC, answered
How much power does Old Hayneville Solar, LLC produce?
Old Hayneville Solar, LLC has 80 MW of capacity from one generator. No full year of generation is reported yet.
Where is Old Hayneville Solar, LLC?
Old Hayneville Solar, LLC is in Montgomery County, Alabama, at about 32.318°, -86.411°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Montgomery County goes 3.9 hours a year without power, the 47th most of 60 counties in Alabama. The county's page has the full outage record.
Who operates Old Hayneville Solar, LLC?
It is operated by Modal Power LLC (EIA sector: IPP Non-CHP), and it feeds Southern Company.
When did Old Hayneville Solar, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.