Storage power plant · Young, TX
Olney
Olney is a 20 MW storage power plant in Young County, Texas, operated by HEN Infrastructure, L.L.C.. Its oldest generator still running came online in 2023.
Olney in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 106th largest, about 0.1% of the state's 16 GW of storage capacity.
Young County has 4 power plants of 1 MW or more with 1.4 GW in all; Olney is 1% of that.
The average electricity customer in Young County goes 5.6 hours a year without power, the 187th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Olney (outlined) and other plants in Young County, shaded. 33.371, -98.720.
Plant facts
- Operator
- HEN Infrastructure, L.L.C.
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Young County, TX
- EIA plant ID
- 65832
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OLNEY | Batteries | 9.9 MW · 10 MWh | 2023 | – |
| OLNYD | Petroleum Liquids | 9.9 MW | 2026 | – |
Nearby
Other plants in Young County
Questions
Olney, answered
How much can Olney store and deliver?
Olney can deliver up to 20 MW and hold 10 MWh of energy, from 2 storage units. Its net energy in 2025 was -0.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Olney?
Olney is in Young County, Texas, at about 33.371°, -98.720°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Young County goes 5.6 hours a year without power, the 187th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Olney?
It is operated by HEN Infrastructure, L.L.C. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Olney open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.