Natural gas power plant · Manistee, MI
PCA, Filer City Mill
PCA, Filer City Mill is a 20 MW natural gas power plant in Manistee County, Michigan, operated by PCA, Filer City Mill. Its oldest generator still running came online in 1950. In 2025 it generated 90 GWh, about what 12,000 average Michigan homes use in a year.
PCA, Filer City Mill in context
Among the 59 natural gas plants in Michigan in the EIA's inventory, it is the 38th largest, about 0.1% of the state's 15 GW of natural gas capacity.
Manistee County has 3 power plants of 1 MW or more with 110 MW in all; PCA, Filer City Mill is 18% of that.
Its capacity factor of 53% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Manistee County goes 10 hours a year without power, the 56th most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
PCA, Filer City Mill (outlined) and other plants in Manistee County, shaded. 44.213, -86.287.
Plant facts
- Operator
- PCA, Filer City Mill
- Sector
- Industrial CHP
- Grid operator
- MISO
- County
- Manistee County, MI
- EIA plant ID
- 58066
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TG3 | Natural Gas Steam Turbine | 12 MW | 1950 | – |
| TG2 | Natural Gas Steam Turbine | 8.0 MW | 1950 | – |
Nearby
Other plants in Manistee County
Questions
PCA, Filer City Mill, answered
How much power does PCA, Filer City Mill produce?
PCA, Filer City Mill has 20 MW of capacity from 2 generators. In 2025 it generated 90 GWh, 53% of the most it could have made running flat out all year (its capacity factor).
How many homes does PCA, Filer City Mill power?
Its 2025 output of 90 GWh equals the yearly electricity use of about 12,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is PCA, Filer City Mill?
PCA, Filer City Mill is in Manistee County, Michigan, at about 44.213°, -86.287°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Manistee County goes 10 hours a year without power, the 56th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates PCA, Filer City Mill?
It is operated by PCA, Filer City Mill (EIA sector: Industrial CHP), and it feeds MISO.
When did PCA, Filer City Mill open?
Its oldest generator still running came online in 1950.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.