Hydro power plant · Hardin, TN
Pickwick Landing Dam
Pickwick Landing Dam is a 240 MW hydro power plant in Hardin County, Tennessee, operated by Tennessee Valley Authority. Its oldest generator still running came online in 1938. In 2025 it generated 1.3 TWh, about what 91,000 average Tennessee homes use in a year.
Pickwick Landing Dam in context
Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the largest, about 9.5% of the state's 2.5 GW of hydro capacity.
Hardin County has 2 power plants of 1 MW or more with 313 MW in all; Pickwick Landing Dam is 77% of that.
Its capacity factor of 62% in 2025 is higher than the 34% typical for hydro plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pickwick Landing Dam (outlined) and other plants in Hardin County, shaded. 35.068, -88.249.
Plant facts
- Operator
- Tennessee Valley Authority
- Sector
- Electric Utility
- Grid operator
- TVA
- County
- Hardin County, TN
- EIA plant ID
- 3415
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 40 MW | 1938 | – |
| 2 | Conventional Hydroelectric | 40 MW | 1938 | – |
| 3 | Conventional Hydroelectric | 40 MW | 1942 | – |
| 4 | Conventional Hydroelectric | 40 MW | 1942 | – |
| 5 | Conventional Hydroelectric | 40 MW | 1952 | – |
| 6 | Conventional Hydroelectric | 40 MW | 1952 | – |
Nearby
Other plants in Hardin County
Questions
Pickwick Landing Dam, answered
How much power does Pickwick Landing Dam produce?
Pickwick Landing Dam has 240 MW of capacity from 6 generators. In 2025 it generated 1.3 TWh, 62% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pickwick Landing Dam power?
Its 2025 output of 1.3 TWh equals the yearly electricity use of about 91,000 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pickwick Landing Dam?
Pickwick Landing Dam is in Hardin County, Tennessee, at about 35.068°, -88.249°. It is one of 2 power plants of 1 MW or more in the county.
Who operates Pickwick Landing Dam?
It is operated by Tennessee Valley Authority (EIA sector: Electric Utility), and it feeds the Tennessee Valley Authority.
When did Pickwick Landing Dam open?
Its oldest generator still running came online in 1938.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.