Wind power plant · Twin Falls, ID
Pilgrim Stage Wind Park
Pilgrim Stage Wind Park is a 11 MW wind power plant in Twin Falls County, Idaho, operated by Idaho Wind Partners 1 LLC. Its oldest generator still running came online in 2011. In 2025 it generated 30 GWh, about what 2,700 average Idaho homes use in a year.
Pilgrim Stage Wind Park in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the 31st largest, about 0.9% of the state's 1.1 GW of wind capacity.
Twin Falls County has 27 power plants of 1 MW or more with 598 MW in all; Pilgrim Stage Wind Park is 2% of that and the 9th largest of 11 wind plants there.
Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Twin Falls County goes 2.0 hours a year without power, the 31st most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pilgrim Stage Wind Park (outlined) and other plants in Twin Falls County, shaded. 42.797, -114.999.
Plant facts
- Operator
- Idaho Wind Partners 1 LLC
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Twin Falls County, ID
- EIA plant ID
- 56440
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PSWP | Onshore Wind Turbine | 11 MW | 2011 | – |
Questions
Pilgrim Stage Wind Park, answered
How much power does Pilgrim Stage Wind Park produce?
Pilgrim Stage Wind Park has 11 MW of capacity from one generator. In 2025 it generated 30 GWh, 33% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pilgrim Stage Wind Park power?
Its 2025 output of 30 GWh equals the yearly electricity use of about 2,700 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pilgrim Stage Wind Park?
Pilgrim Stage Wind Park is in Twin Falls County, Idaho, at about 42.797°, -114.999°. It is one of 27 power plants of 1 MW or more in the county. The average electricity customer in Twin Falls County goes 2.0 hours a year without power, the 31st most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Pilgrim Stage Wind Park?
It is operated by Idaho Wind Partners 1 LLC (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Pilgrim Stage Wind Park open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.