Solar power plant · Barber, KS

Pixley Solar Energy

Pixley Solar Energy is a 189 MW solar power plant in Barber County, Kansas, operated by Public Service Co of Oklahoma. Its oldest generator still running came online in 2025. In 2025 it generated 300 GWh, about what 29,000 average Kansas homes use in a year.

Capacity189 MWNameplate, September 2026
Generated300 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Pixley Solar Energy in context

Among the 39 solar plants in Kansas in the EIA's inventory, it is the largest, about 44% of the state's 434 MW of solar capacity.

Barber County has 3 power plants of 1 MW or more with 283 MW in all; Pixley Solar Energy is 67% of that.

The average electricity customer in Barber County goes 1.1 hours a year without power. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pixley Solar Energy (outlined) and other plants in Barber County, shaded. 37.266, -98.500.

Plant facts

Operator
Public Service Co of Oklahoma
Sector
Electric Utility
Grid operator
SWPP
County
Barber County, KS
EIA plant ID
68498
Where Kansas's power comes from → Kansas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PIXLY Solar Photovoltaic 189 MW 2025 –

Questions

Pixley Solar Energy, answered

How much power does Pixley Solar Energy produce?

Pixley Solar Energy has 189 MW of capacity from one generator. In 2025 it generated 300 GWh.

How many homes does Pixley Solar Energy power?

Its 2025 output of 300 GWh equals the yearly electricity use of about 29,000 average Kansas homes (876 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pixley Solar Energy?

Pixley Solar Energy is in Barber County, Kansas, at about 37.266°, -98.500°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Barber County goes 1.1 hours a year without power. The county's page has the full outage record.

Who operates Pixley Solar Energy?

It is operated by Public Service Co of Oklahoma (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.

When did Pixley Solar Energy open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Kansas home's 876 kWh a month in 2025. Methodology.