Oil power plant · Oakland, MI

Placid 12

Placid 12 is a 14 MW oil power plant in Oakland County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 1970. In 2025 it generated 0.2 GWh, about what 26 average Michigan homes use in a year.

Capacity14 MWNameplate, September 2026
Generated0.2 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators5Oldest from 1970

Placid 12 in context

Among the 57 other-fuel plants in Michigan in the EIA's inventory, it is the 18th largest, about 1.5% of the state's 873 MW of other-fuel capacity.

Oakland County has 4 power plants of 1 MW or more with 152 MW in all; Placid 12 is 9% of that and the largest of 3 oil plants there.

Its capacity factor of 0% in 2025 is lower than the 25% typical for oil plants across the US.

The average electricity customer in Oakland County goes 16 hours a year without power, the 37th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

00011112018201920212022202320242025GWh 0
000111120182021202320250

Where it is

Placid 12 (outlined) and other plants in Oakland County, shaded. 42.711, -83.457.

Plant facts

Operator
DTE Electric Company
Sector
Electric Utility
Grid operator
MISO
County
Oakland County, MI
EIA plant ID
1737
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Petroleum Liquids 2.7 MW 1970 –
2 Petroleum Liquids 2.7 MW 1970 –
3 Petroleum Liquids 2.7 MW 1970 –
4 Petroleum Liquids 2.7 MW 1970 –
5 Petroleum Liquids 2.7 MW 1970 –

Nearby

Other plants in Oakland County

Hancock · 122 MWPutnam (MI) · 14 MWEagle Valley (MI) · 3.2 MW

Questions

Placid 12, answered

How much power does Placid 12 produce?

Placid 12 has 14 MW of capacity from 5 generators. In 2025 it generated 0.2 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does Placid 12 power?

Its 2025 output of 0.2 GWh equals the yearly electricity use of about 26 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Placid 12?

Placid 12 is in Oakland County, Michigan, at about 42.711°, -83.457°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Oakland County goes 16 hours a year without power, the 37th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Placid 12?

It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.

When did Placid 12 open?

Its oldest generator still running came online in 1970.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.