Solar power plant · Lamb, TX

Plant X Solar

Plant X Solar is a 150 MW solar power plant in Lamb County, Texas, operated by Southwestern Public Service Co. Its oldest generator still running came online in 2026.

Capacity150 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Plant X Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 116th largest, about 0.4% of the state's 37 GW of solar capacity.

Lamb County has 3 power plants of 1 MW or more with 1.5 GW in all; Plant X Solar is 10% of that.

The average electricity customer in Lamb County goes 1.6 hours a year without power, the 233rd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Plant X Solar (outlined) and other plants in Lamb County, shaded. 34.166, -102.405.

Plant facts

Operator
Southwestern Public Service Co
Sector
Electric Utility
Grid operator
SWPP
County
Lamb County, TX
EIA plant ID
69435
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PLXS Solar Photovoltaic 150 MW 2026 –

Nearby

Other plants in Lamb County

Questions

Plant X Solar, answered

How much power does Plant X Solar produce?

Plant X Solar has 150 MW of capacity from one generator. No full year of generation is reported yet.

Where is Plant X Solar?

Plant X Solar is in Lamb County, Texas, at about 34.166°, -102.405°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Lamb County goes 1.6 hours a year without power, the 233rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Plant X Solar?

It is operated by Southwestern Public Service Co (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.

When did Plant X Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.